As you can see the digger is back and we have soil and broken pipes everywhere. Work started on Monday of this week and is progressing. Note the temporary water and soil pipe from the ensuite bathroom.
On Tuesday it had disappeared as we now have a temporary proper pipe connected to the new drains. Building Inspector came and thank goodness we do not need to have soakaways for the surface water drainage.
Seems to me that the amount of rubble is growing too.
It has managed to stay rain free for two days but can it last?
Apart from Sox finding both the wheelbarrow and the channels that had been dug out for the pipes amazing places to play and stalk me from - the moral of the story is .....
Ensure you can actually get your wheelbarrow around the outside of the house to the rubbish pile before filling it so full!!